The line graph shows how much time did it take to produce a single car by four American car manufacturers between the years 1998 and 2002.
Overall, while the figures for GM (General Motors), DC (Daimler Chrysler) and Nissan dropped, the production time of a single Ford took longer by the end of the period. It is also clear that although Nissan vehicles took long enough time to be fully manufactured initially, it became the lowest time-consuming car manufacturer.
Standing at an impressive one and a half day initially, the figure for Nissan decreased dramatically, and by 2002, it hit a low of 21 hours. In contrast, the second place manufacturer, namely Daimler Chrysler, produced a vehicle in a 34 hour time-span in 1998, a figure that then declined by 6 hours in 2002. The time taken to assemble GM car was roughly 32 hours in 1998, but it did not last long, and by 2002, there was an 8-hour reduction.
The company Fort, on the other hand, was the sole manufacturer in which the production time increased. Despite an initial rise to 27 hour from a low 24 hour, it decreased to 26 hour-production.
Estimated score is 7.5 ~ 8.0
Overall, while the figures for GM (General Motors), DC (Daimler Chrysler) and Nissan dropped, the production time of a single Ford took longer by the end of the period. It is also clear that although Nissan vehicles took long enough time to be fully manufactured initially, it became the lowest time-consuming car manufacturer.
Standing at an impressive one and a half day initially, the figure for Nissan decreased dramatically, and by 2002, it hit a low of 21 hours. In contrast, the second place manufacturer, namely Daimler Chrysler, produced a vehicle in a 34 hour time-span in 1998, a figure that then declined by 6 hours in 2002. The time taken to assemble GM car was roughly 32 hours in 1998, but it did not last long, and by 2002, there was an 8-hour reduction.
The company Fort, on the other hand, was the sole manufacturer in which the production time increased. Despite an initial rise to 27 hour from a low 24 hour, it decreased to 26 hour-production.
Estimated score is 7.5 ~ 8.0